Mustang Quarry | Specialty Engineer
Mustang Quarry
Category : Specialty
A local quarry worked with the team to design a modification plan regarding one of their conveyor towers. The team designed a three step repair plan that would return the structural integrity of the tower as well as have the tower operational in a quick manner. The repairs took place in many places of the tower such as the base plates, guy-wires, and cross-sections.