• slot gacor
  • NTFPD Fire Station 53 | Seismic Evaluation Engineering | Linchpin Structural Engineering
    Loading
    Share This
    Contact
    Scroll Down
    Back to portfolio

    NTFPD Fire Station 53 | Seismic Evaluation Engineering

    //NTFPD Fire Station 53 | Seismic Evaluation Engineering

    NTFPD Fire Station 53

    Category : Public

    As part of determining the feasibility of remodeling the station to meet future needs versus constructing a new station, North Tahoe Fire Protection District retained Linchpin Senior Principal Doug Gadow to perform a seismic evaluation of the existing building. Mr. Gadow developed a list of issues and recommended mitigation measures for the District’s use. Mr. Gadow was Engineer of Record for this project at his previous employer, Gary Davis Group.

    READY TO ORDER YOUR PROJECT ?

    Contact
    Close